A cost reduction programme, from spend data to decisions.
Send the spend cube summary, the workshop results and the constraints. FrameBind builds the case for the CFO: where the money is, what each lever is worth, how the savings ramp, and what needs a decision today.

A real example, exactly as it downloaded.
What went in
A fictional external spend analysis for Brennvik Pumps, a manufacturer with three plants, written for this example: addressable spend by category, savings sized in category workshops, lever benchmarks, timing, cost and cash, and the constraints. About 760 words and 3 tables.
- Source: a fictional spend analysis (Word)
- Audience: the CFO and COO
- Output: 14 slides, 1 native chart, 2 tables
What came out
“Brennvik: Spend into Margin”: 14 slides in an original design (Editorial direction), with 1 native chart and 2 native tables you can edit in PowerPoint. Nothing was touched up after export. Click a slide to page through it, or open the file yourself.
Download the .pptx117 KBThe storyline, slide by slide.
Every headline in the deck, in order. This is the outline you approve before anything is built.
- 01Brennvik Pumps: Turning External Spend into Margin
- 02Executive summary: a 2.5–4.0 point margin uplift, EUR 35m of cash, three waves and four decisions
- 03Brennvik earns 6.8% EBIT while peers earn 10–12%, and external spend is 55% of revenue
- 04Spend is concentrated: three direct categories account for 47% of addressable spend
- 05Three plants buy separately, so Brennvik pays for fragmentation
- 06Where contract coverage is low, Brennvik pays up to 15% above benchmark
- 07Workshops sized EUR 33–54m of run-rate savings, 40% of it in castings and machined parts
- 08Five levers drive the savings, each proven against external benchmarks
- 09At full run-rate, EBIT margin rises from 6.8% to 9.3–10.8%, bringing Brennvik into the peer range
- 10Savings ramp over three years; payment terms release EUR 35m of cash up front
- 11A three-wave programme: quick wins first, then the larger structural savings
- 12Wave 1: six quick wins can go live within six months, starting with the April motor renewal
- 13Four constraints decide how fast the larger waves deliver
- 14Decisions requested today
You approve the plan. Then you get the file.
Send the analysis.
Spend by category, workshop savings ranges, benchmarks, timing and constraints, in one PDF or Word file up to 50 MB. Say who signs off.
Approve the storyline.
Check the savings story and every slide headline before anything is built. Ask for the decisions up front, or another wave split, in plain words.
Finish it in PowerPoint.
Savings tables and the margin chart are real PowerPoint objects. When the ranges move after the next workshop, update them in place.
What you still do
The slides are shown exactly as they downloaded, including a chart legend on slide 10 that touches a label and needs a nudge in PowerPoint. Savings ranges come from your source; check them before the deck goes to the CFO.
Questions.
More in the main FAQ, or email contact@framebind.com.
Send the material behind your next deck.
Plans from $149 a month, or try one deck for $49. A deck that fails goes back to your allowance automatically.


